Chandler Weeks

About

Profile Image

Jason Chandler Weeks

Knoxville, TN

Graduate Research Assistant

Computer Science

I'm Chandler, a second-year Master's candidate at the University of Tennessee, Knoxville. I work as a Graduate Research Assistant in the Global Computing Lab. My work combines software development, artificial intelligence, and environmental science. I have contributed software updates to SOMOSPIE and GEOtiled, which use AI to generate soil-moisture and terrain parameters. I work in agile teams with collaborators at Arizona State University and IBM.

I have experience with C#, Python, and JavaScript. I use Linux to support CI/CD pipelines and to build and deploy cloud services with Docker and Kubernetes. I also build AI pipelines that process multiple terabytes of data for real applications and scale across computing clusters.

Outside of work, I enjoy running, hiking, biking, brewing coffee, and attending concerts. I completed the 2026 Knoxville Marathon and continue to train as a runner and athlete. I enjoy visiting national parks, running and hiking with my girlfriend, and camping as a way to spend time away from technology.

Projects

Software Engineering

YAW logo

Yet Another Workspace

All-in-one workspace manager for email, notes, calendars, tasks, and AI help.

GitHub

Machine Learning

High-resolution soil-moisture prediction over Alabama

SOMOSPIE

A geospatial machine-learning pipeline that downscales coarse satellite soil-moisture estimates into high-resolution predictions.

GitHub
Terrain elevation map of North America

GEOtiled

A scalable workflow that partitions digital elevation models to accelerate accurate high-resolution terrain-parameter generation.

GitHub

Systems & Architecture

Memory hierarchy simulator access trace

Memory Hierarchy Simulator

A configurable C++ simulator that traces every memory access through a TLB, page table, multi-level caches, memory, and disk.

GitHub
Orange Rust operating system logo

RISC-V Operating System

A Rust-based operating system built for the RISC-V architecture.

GitHub

Experience

Aug 2025 - Present

Knoxville, TN

PyTorchGDALHPCGeospatial

Graduate Research Assistant

Global Computing Laboratory

  • Enhanced a soil moisture inference pipeline across North America, increasing spatial resolution from 27 km² to 30 m² by fine-tuning geospatial foundation models and integrating a forecasting algorithm.
  • Designed scalable data preprocessing pipelines to remove cloud contamination and optimize terabytes of geospatial satellite imagery datasets for high-accuracy soil moisture forecasting.
  • Authored and deployed technical documentation for existing soil moisture inference tools to support development and usability for scientists.

Feb 2024 - May 2025

Starkville, MS

Scikit-LearnPythonUSDAVisualization

Undergraduate Research Assistant

Mississippi State Dept. of Computer Science

  • Developed a machine learning algorithm to predict changes in Vesicular Stomatitis Virus cases per month for use as an early-warning strategy for disease spread.
  • Refined preprocessing steps to cluster results to eco-regions, maximizing interpretability and algorithm efficiency without compromising accuracy.
  • Collaborated with USDA scientists to design a scientific data visualization tool, improving researchers' ability to analyze and communicate results.

May 2023 - Aug 2023

Ridgeland, MS

SQL ServerPower BIPython Automation

Software Developer Intern · Tools & Automation

C-Spire

  • Modified and maintained a Microsoft SQL Server database to address evolving software requirements.
  • Created comprehensive documentation for software products developed by the Tools & Automation team, increasing usability for external teams.
  • Developed a dynamic KPI reporting model leveraging Power BI to automate data updates, visualize performance trends, and support decision making.

Skills

Languages

PythonC++CC#TypeScriptJavaScriptSQL

Application Development

ASP.NET CoreReactNext.jsExpressFastAPITailwind CSSREST APIs

Data & ML

SQL ServerPostgreSQLMongoDBPyTorchScikit-learn

Cloud, DevOps & Workflow

Microsoft AzureAWSDockerKubernetesGitHub ActionsGitGitHubLinuxBashAgilexUnit

Education

University of Tennessee, Knoxville

M.S. Computer Science

GPA 3.58 / 4.00 · Knoxville, TN

Expected May 2027

Mississippi State University

B.S. Software Engineering

GPA 4.00 / 4.00 · Starkville, MS

May 2025

Relevant Coursework

  • Computer Architecture
  • Database Management Systems
  • Artificial Intelligence
  • Machine Learning
  • Deep Learning
  • Natural Language Processing
  • Computer Vision
  • Advanced Algorithms

Contact

I'd love to talk about my research or machine learning work. Feel free to reach out via email.

[email protected]
Location
Knoxville, TN